Skip to content
Closing soon? See the latest date to order each report.Free timeline →
Get a quote

Commercial Underground Storage Tank Removal and Closure in Seattle and Puget Sound

Short answer

Kee Enviro closes commercial underground storage tanks (USTs) at gas stations, fleet yards, and industrial sites across Puget Sound. For a regulated tank, Washington requires a 30-day notice to Ecology, ICC-certified decommissioning, and a site assessment. If the assessment finds a release, report it to Ecology within 24 hours and send a site characterization report within 90 days.

Excavator lifts a steel underground fuel tank out of the ground at a commercial fuel site

What is included

01

Records and closure plan

We review tank registrations, past closure reports, and leak records. Then we plan the closure and the sampling.

02

Notices and permits

We prepare the 30-day closure notice to Ecology and get the local fire permit.

03

Tank, piping, and dispenser removal

Our heavy equipment partners remove the tanks, product lines, and dispensers. We record the condition of each part.

04

Closure site assessment

We collect soil and groundwater samples at the tank pit, piping runs, and dispensers, as Washington rules require.

05

Cleanup

If the samples show a release, we excavate contaminated soil and plan any groundwater work.

06

Reports and agency path

We send the site assessment or site characterization report. For a release, we help you enter PLIA's Technical Assistance Program for a No Further Action opinion.

How it works

  1. 01

    Records review and quote

    Send us the site address and the tank records. We confirm the scope and send a quote.

  2. 02

    Notice and permit

    We send Ecology the 30-day notice and get the local permit.

  3. 03

    Closure and sampling

    The tanks come out. We sample soil and groundwater at each required location.

  4. 04

    Report and next step

    We send the report within the deadline. If there is a release, we give you a cleanup scope and cost range.

Typical timeline

30-day notice, then a report within 30 days of closure

Who this service is for

  • Gas station and convenience store owners who are closing, replacing, or upgrading tanks
  • Buyers and developers of former stations who need the tanks out and the soil cleared before construction
  • Fleet, utility, and industrial sites with fuel or waste oil tanks
  • Lenders and attorneys who need closure records before a deal closes

Washington rules that apply

Closure of a regulated tank

Ecology’s UST program sets these steps for permanent closure:

  • Send Ecology a 30-day notice before closure work starts.
  • Use ICC-certified UST service providers for decommissioning.
  • Have a site assessment done by an ICC-certified site assessor, a Washington professional engineer, or a licensed hydrogeologist.
  • Send the site assessment report within 30 days of closure if no release is found.
  • Send a site characterization report within 90 days of closure if a release is found.

Report a suspected or confirmed release to Ecology within 24 hours.

Local permits

Most cities also require a fire department permit for tank removal. Fees and rules change by city. We get the permit before work starts.

Cleanup and No Further Action

Petroleum releases from tank systems do not go to Ecology’s Voluntary Cleanup Program. They go to the Pollution Liability Insurance Agency (PLIA) Technical Assistance Program (TAP). PLIA lists a $10,000 enrollment fee per release or tank system for gasoline or diesel sites. TAP reviews the cleanup and can issue a No Further Action opinion.

MTCA liability

Under Washington’s Model Toxics Control Act (MTCA), liability is strict, joint and several. A current owner can pay for cleanup even if a past owner caused the release. Good closure records protect you in a sale or refinance.

Why Kee

  • Since 1996. Kee has closed tanks and cleaned up fuel sites across Puget Sound for decades.
  • One team. We handle the notice, permit, sampling, cleanup, and reports.
  • Fast for deals. We work to the closing date.
  • Engineering and science in-house. Our staff cover engineering, geology, hydrogeology, chemistry, and construction.

Next step

See our gas station page for the full due diligence path. Plan the dates with the due diligence timeline. Call 206-914-4989 to quote a closure.

Commercial UST Removal and Closure: FAQ

What notice does Washington require before a UST closure?

For a regulated tank, Ecology requires a notice 30 days before closure work starts.

Who can do the closure site assessment?

An ICC-certified site assessor, a Washington professional engineer, or a licensed hydrogeologist.

What happens if the samples show a release?

The owner or operator reports it to Ecology within 24 hours. A site characterization report is due within 90 days of closure. Then the cleanup starts.

Can a petroleum tank site use Ecology's Voluntary Cleanup Program?

No. Ecology's VCP does not accept petroleum released from a petroleum storage tank system. These sites can use PLIA's Technical Assistance Program, which can issue a No Further Action opinion.

How much does a commercial UST closure cost?

Cost depends on the number and size of tanks, piping length, site access, and whether a release is found. We send a written quote after we review the tank records.

Related services

Commercial UST Removal and Closure inFederal WaySeattleBellevueTacomaKentAuburnRentonRedmond

Tell us about your property.