Phase II Environmental Site Assessments in Seattle and Puget Sound

Short answer

A Phase II Environmental Site Assessment collects soil, groundwater, or soil vapor samples to confirm or deny the suspect conditions found in a Phase I. A lab tests the samples. The report tells you if contamination is present, where it is, and if it is above Washington cleanup levels.

Gloved hands hold a soil core sample collected during a Phase II assessment

What is included

01

Sampling plan

We design a plan that targets each concern from the Phase I, so you only pay for the testing you need.

02

Field sampling

We coordinate drilling and direct-push contractors to collect soil, groundwater, and vapor samples.

03

Lab analysis

An accredited lab tests the samples for the chemicals that match the past use of the site.

04

Data review

Our team compares the results to Washington cleanup levels and explains what they mean.

05

Phase II report

You get a report with maps, data tables, and clear advice on next steps.

How it works

  1. 01

    Review the Phase I

    We read the Phase I and pick the concerns that need testing.

  2. 02

    Scope and quote

    We send a sampling plan, a quote, and a schedule that fits your deal.

  3. 03

    Fieldwork

    Our team and our drilling contractors collect samples, often in one day.

  4. 04

    Lab results and report

    We review the lab data and send a report with findings and options.

Who a Phase II is for

A Phase II is for buyers, lenders, and owners who need hard data. The Phase I tells you what might be wrong. The Phase II confirms or denies those suspect conditions with samples and lab results.

Common reasons to order a Phase II:

  • The Phase I found a recognized environmental condition (REC)
  • The site was a gas station, dry cleaner, auto shop, or industrial use
  • There is a known or suspected underground tank
  • A lender requires sampling before it funds the loan
  • You plan to redevelop and need to know how much soil will need special handling

What you get

A focused sampling plan

We do not test everything. We target each concern from the Phase I. This keeps cost and time down.

Field sampling

Our staff coordinate the field work with drilling and heavy equipment contractors. Based on the site, we may collect:

  • Soil samples from borings or test pits
  • Groundwater samples from temporary or permanent wells
  • Soil vapor samples to check for vapors that can move into buildings

Lab analysis and data review

An accredited lab tests the samples. Our team includes chemists, geologists, and hydrogeologists. They compare the results to Washington cleanup levels and explain what they mean.

A clear report

The report includes site maps, sample locations, data tables, and plain-language findings. It tells you if contamination is present, where it is, and what to do next.

Washington rules that apply

ASTM E1903

ASTM E1903 is the standard practice for Phase II Environmental Site Assessments. The current version is E1903-19. Lenders and agencies may also ask for added steps.

MTCA liability

Washington’s Model Toxics Control Act (MTCA) uses strict, joint and several liability. A current owner can be liable for cleanup costs even if a past owner caused the problem. Phase II data helps you price that risk before you close.

Voluntary Cleanup Program

If the Phase II finds contamination, Washington’s Department of Ecology runs a Voluntary Cleanup Program (VCP). Under the VCP, an owner can clean up a site and ask Ecology for a written opinion, such as a No Further Action (NFA) opinion. Phase II data is often the first step toward a VCP application.

Result Usual next step
No contamination found Close the deal with the report on file
Contamination below cleanup levels Document the results, discuss with your lender
Contamination above cleanup levels Plan cleanup, consider the VCP

Why Kee

  • In-house science and engineering. Our team covers engineering, geology, hydrogeology, chemistry, and environmental science.
  • Field coordination. We work with heavy equipment and drilling contractors we know.
  • Speed. We are poised to move quickly to meet tight transaction schedules.
  • One path to closure. If cleanup is needed, our remediation team can take the next step.
  • Since 1996. Kee has served Puget Sound property owners since the firm started in Redmond.

Next step

Not sure if you need a Phase II? Try our Phase II checker. If you already know there is contamination, see our remediation services or call 206-914-4989.

Phase II Environmental Site Assessments: FAQ

When do I need a Phase II?

You usually need one when a Phase I finds a recognized environmental condition, such as an old tank, a dry cleaner, or a past fuel release. A lender may also require it.

Which standard does a Phase II follow?

ASTM E1903 is the standard practice for Phase II assessments. The current version is E1903-19.

What if the Phase II finds contamination?

We explain the options. These can include more testing, cleanup, or entry into the Washington Department of Ecology Voluntary Cleanup Program.

How long does a Phase II take?

A focused Phase II often takes three to six weeks. Lab turnaround and site access are the main factors.

Can a Phase II be done before closing?

Yes. We are poised to move quickly to meet tight transaction schedules. Tell us your closing date when you ask for a quote.

Guides

My Phase I Found a REC. What Happens Next? →Phase I vs Phase II ESA: What Is the Difference? →

Related services

Phase II Environmental Site Assessments inFederal WaySeattleBellevueTacomaKentAuburnRentonRedmond

Tell us about your property.